Monday, September 3, 2012

PSE Data Sheets


                                         
A data sheet for each PSE is provided in Section 2A-14-XX -
Each data sheet contains the following:
(1) Supplemental Inspection Number
(2) Title
(3) Effectivity
(4) Inspection Compliance
(5) Initial Inspection Interval(s)
(6) Repeat Inspection Interval(s)
(7) Purpose
(8) Inspection Instructions
(9) Access/Location/Zone
(10) Detectable Crack Size
(11) Inspection Procedure
(12) Repair/Modification
(13) Comments
NOTE: Inspection intervals are given in both hour and calendar time. After the completion of each initial SID inspection, repeat inspections may be completed based on hour time if the Corrosion Prevention and Control Program (CPCP) in Section 2A-30-00 is included in the airplane maintenance program.



No comments:

Post a Comment