1. Supplemental Inspection Procedures
A. Each of the supplemental inspections has the instructions to do each Nondestructive Testing procedure
needed.
B. Procedure
(1) Each 2A-14-XX section has the details of the
inspection and if needed, a reference to the Nondestructive Testing procedure
for that inspection.
(2) The supplemental inspections that reference a
Nondestructive Testing procedure will refer to 2A-13-01 document for the
details of the procedure.
(3) The supplemental inspection numbers in the list
below agree with the number for the Nondestructive Testing procedure, if
applicable. Refer to Inspection Requirements - Hours to Years Equivalence.
C. If an airplane has exceeded the inspection
limits given, the inspection must be done before June 30, 2014. Inspections in
subsequent revisions to the SID shall be accomplished in accordance with the requirements
of the revised inspection.
D. Service Information Letters/Service Bulletins
(1) In addition to this maintenance manual, the
following service information will be required to complete the SID inspections
(2A-14-XX document sections).
Bulletin Title Associated Service Kit
SE79-49 Nut Plate Inspection - Vertical Fin Attach
Bracket (for units
15279406 thru 15284541,
SEB01-01 Rudder Stop Modification SK152-24A, SK152-25A
SEB03-6 Vertical Tail Attach Bracket and Aft
Horizontal Stabilizer Spar
Inspection (for units 15279406 thru 15284541)
SEB07-4 Floorboard/Seat Pan Crack Inspection
SEB87-04 Aileron Hinge Inspection
SEB94-03 Rudder Spar Inspection/Replacement
SEB95-03 Flap Support Inspection and Roller Washer
Installation SK180–44
SEB96-07 AN3-5A Bolt Inspection/Replacement
No comments:
Post a Comment