Reporting
A. The minimum
requirements to prevent or control the corrosion in the Corrosion Prevention
and Control Program (CPCP) were made on the best information, knowledge and
experience available at the time. As this experience and knowledge increases,
the CPCP's intervals will be changed as necessary.
Refer to CPCP Damage
Report Form (Figure 2 in Section 2A-30-00).
(1) You must contact the
Cessna Aircraft Company about all Level 2 or 3 corrosion of the structure that
is on the list in the Baseline Program that is found during the second and
subsequent corrosion program inspections. Refer to Reporting System.
NOTE: You do not have to contact the Cessna Aircraft Company about corrosion that
is found on structure that is not on the list in the Baseline Program, for
example the secondary structure.
Program
Implementation
A. When a CPCP is
started it is important to do the items that follow:
(1) Start inspections at
the recommended interval following the completion of the first SID inspection.
(2) Once the corrosion
program inspection (CPI) is started, repeat the subsequent applications of the
CPI at the recommended interval for each CPI.
(3) You can start a CPCP
on the basis of individual CPIs or groups of CPIs.
(4) Cessna Aircraft
Company highly recommends to start all of the CPIs as soon as possible. This is
the most cost effective way to prevent or control corrosion.
No comments:
Post a Comment